Sunday, September 19, 2010
Saturday, August 7, 2010
Friday, July 23, 2010
167.4
Wednesday, July 7, 2010
168.8
work. the shelf turned out better than I thought they would. the last pic is first, the start of the day. the blue thing is the vanity for the bath. the white box on top is the sink. every one is getting them that way. silly. stainless steel top with white plastic on it for protection. it has wheels. so that was my day.
Saturday, July 3, 2010
165.2
the week is done. no paint on the wainscot yet. it appears simple however the margins were highly critical. to create each panel there are 8 pieces of trim. over 150 bits of trim so over 300 individual trim cuts. that is the trim alone. the panels and grid add a considerable amount more. to make this project more difficult all cutting had to be done outside and downstairs. walking walking walking. a mantle to design next
Thursday, June 24, 2010
170.1

hot I say. taking friday off. got a little banking to do. got a door put in, had to rip the header. what a mess. all worked out. nice action. and so the guy likes the cabinet I hear. I'm so frustrated with the job. he is very smart but is giving us too little too late. now no material to work with. all on order. and so back to an old job where I helped with a walk in humidor. secret door and stuff. cigars can be costly. thus the need to hide them I guess. the first pic is humidor
Thursday, June 10, 2010
168.8
Subscribe to:
Posts (Atom)
